Detached Single-Family Dwelling Nueva Andalucía Housing Development
Detached single-family dwelling
Magnificent contemporary-style detached villa, located in the exclusive urbanization of Nueva Andalucía, Marbella. Situated on the front line of the prestigious Los Naranjos Golf Course, this property combines design, functionality, and luxury in an unparalleled setting.
Upon entering, the modern design and open spaces invite you to enjoy a unique experience. The designer kitchen, open to the dining area and bright living room, creates the perfect environment for socializing, while the stunning views of the golf course through floor-to-ceiling windows form the ideal backdrop.
On the main floor are four en-suite bedrooms, all with access to private terraces, offering privacy and comfort to the occupants. The master suite, nearly 40 m², includes a walk-in closet and an elegant open-concept bathroom, evoking the feeling of a luxurious hotel suite.
The exterior is a paradise for rest and relaxation. The spacious pool area is surrounded by carefully designed lounging spaces and water features that blend seamlessly with the golf course views.
On the rooftop, the villa reaches its peak of luxury and entertainment. This space includes an outdoor kitchen, lounging areas, al fresco dining, an outdoor cinema, and a jacuzzi, all with panoramic views of the valley and the golf course.
Additionally, the villa is equipped with underfloor heating throughout, ensuring maximum comfort all year round.
For wellness enthusiasts, the property features a private designer gym with dark wood finishes, adding an elegant touch.
Housing type
Detached single-family dwelling
Description
Detached single-family dwelling in Urbanization Nueva Andalucía
Property - Promoter
Private Client
Location
Nueva Andalucía housing development, Benahavís (Malaga province)
Project Management
Mr. Antonio Morillo Almarán – Architect – Project Director
Mrs. Esther Sánchez García – Architect - Project Director
Mr. José Antonio Fernández Berrocal – Building Engineer – Project Execution Director
Construction years
2023 – 2024
Execution time
12 months


